Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • Home
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
  • Explore by
    • Research Outputs
    • Researchers
    • Organizations
    • Projects
  • Communities & Collections
  • SDGs
  • Sign in
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub
  2. 電機資訊學院
  3. 電機工程學系
Please use this identifier to cite or link to this item: http://scholars.ntou.edu.tw/handle/123456789/21431
DC FieldValueLanguage
dc.contributor.authorSheng-Huei Leeen_US
dc.contributor.authorWei-Chang Songen_US
dc.contributor.authorJian-Hong Liuen_US
dc.contributor.authorChia-Chi Chuen_US
dc.date.accessioned2022-04-19T02:07:38Z-
dc.date.available2022-04-19T02:07:38Z-
dc.date.issued2012-11-
dc.identifier.isbn978-1-4673-2729-9-
dc.identifier.urihttp://scholars.ntou.edu.tw/handle/123456789/21431-
dc.description.abstractIn order to perform a rapid corrective action, prevent wide-area disturbances, and enhance power system reliability, there is a trend to design and implement inexpensive special protection systems (SPS) in recent years. However, excessive reliance on SPS can result in increased risk. In this paper, the generator rejection schemes (GRS), one of the simplest SPS, will be investigated for Taiwan Power System. Markov modelbased GRS will be studied for reliability assessments of SPS. Two GRS schemes will be analyzed for comparative studies: (1) one out of one rejection for one generator mechanism, and (2) two out of three rejections for one generator mechanism. Transient stability assessments are investigated by using DSATools. From our studies, the following statements can be concluded: (1) The reliability of two out of three rejections for one generator mechanism is better than that of one out of one rejection for one generator mechanism. (2) The power plant without generator rejection mechanism is more risky than the power plant with generator rejection mechanism when power output exceeds a threshold loading. (3) The critical clearing time indeed can be improved if GRS are applied for emergency control.en_US
dc.language.isoen_USen_US
dc.publisherIEEEen_US
dc.titleRisk-based generator rejection protection system design in Taiwan Power Systemen_US
dc.typeconference paperen_US
dc.relation.conference2012 IEEE Power and Energy Society General Meeting,San Diego, CA, USAen_US
dc.identifier.doi10.1109/PESGM.2012.6345007-
item.fulltextno fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_5794-
item.cerifentitytypePublications-
item.languageiso639-1en_US-
item.openairetypeconference paper-
item.grantfulltextnone-
crisitem.author.deptNational Taiwan Ocean University,NTOU-
crisitem.author.deptDepartment of Electrical Engineering-
crisitem.author.deptCollege of Electrical Engineering and Computer Science-
crisitem.author.parentorgCollege of Electrical Engineering and Computer Science-
crisitem.author.parentorgNational Taiwan Ocean University,NTOU-
Appears in Collections:電機工程學系
Show simple item record

Page view(s)

49
Last Week
0
Last month
0
checked on Jun 30, 2025

Google ScholarTM

Check

Altmetric

Altmetric

Related Items in TAIR


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Explore by
  • Communities & Collections
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Build with DSpace-CRIS - Extension maintained and optimized by Logo 4SCIENCE Feedback