Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • 首頁
  • 研究成果檢索
  • 研究人員
  • 單位
  • 計畫
  • 分類瀏覽
    • 研究成果檢索
    • 研究人員
    • 單位
    • 計畫
  • 機構典藏
  • SDGs
  • 登入
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub

The Research of Maritime Engineering for Guided Offshore Wind Farm (I)

瀏覽統計 Email 通知 RSS Feed

  • 簡歷

基本資料

Project title
The Research of Maritime Engineering for Guided Offshore Wind Farm (I)
Code/計畫編號
NSC99-3113-P019-001
Translated Name/計畫中文名
能源國家型科技計畫離岸風力主軸計畫-B5先導型離岸風電場海事工程規劃之研究( I )
 
Project Coordinator/計畫主持人
Lien-Kwei Chien
Funding Organization/主管機關
National Science and Technology Council
 
Department/Unit
Department of Harbor and River Engineering
Website
https://www.grb.gov.tw/search/planDetail?id=2193822
Year
2010
 
Start date/計畫起
01-12-2010
Expected Completion/計畫迄
31-12-2011
 
Bugetid/研究經費
2020千元
 
ResearchField/研究領域
能源工程
環境科學
 

Description

Abstract
台灣地理環境特殊,為颱風與地震等天然災害高潛勢地區,平均每年有三到四次颱風侵襲,且主要是在每年四至十一月間,其中七、八月是侵襲頻率最高。在地震方面,台灣位處環太平洋地震帶,平均15~20年發生一次劇災型地震。國際間雖有大型風機與水深20公尺離岸風場開發經驗,但面對台灣特殊之氣候與地理環境,先進國家離岸風力發展經驗難以直接轉移供國內使用,本研究將參考國外經驗,以供國內開發離岸風電使用參考。本子計畫分兩年進行,第二年度(101年)將配合「能源國家型科技計畫-台灣離岸風電先導型計畫』其他子計畫之設計與規劃,及本研究第一年度(100年)研析成果,提出合適國內發展離岸風力發電海事工程相關之方案建議,並配合政府離岸風力發電發展政策,研擬近程及中長程推動海事工程之具體建議,作為政府主管單位及國內海事工程產業之參考。  Because Taiwan’s special geographical environment, it’s belong to the high potential area of natural disaster for typhoon and earthquake. In average, there are three to four times typhoons every year hit, and they mainly occur from April to November each year. Among of which July and August are the most frequently. For the disaster of earthquake, it occurred recurrence a strong earthquake in 15 to 20 years in average under Taiwan is located in Circum-Pacific Seismic Zone. But when face the special geographical environment, the advance offshore technology of foreign experience is very difficult to direct transfer to domestic. Therefore, in this study will be based on foreign experience, it can provide the reference to development of offshore wind generator for domestic.The sub-project will perform by two years. In second year (101 years), this study make Marine engineering planning with other sub-project results and this sub-project research in the first year (100 years) of major project of National Science and Technology Program – Energy ’Pioneering Offshore Wind-farm Project’. Provide appropriate scheme and advice with short and long-range maritime works of offshore wind power marine engineering for Taiwan, and act in concert with government policy of offshore wind power development. 
 
Keyword(s)
離岸風力發電場
海事工程
海事工程規範
先導型示範場
地理資訊系統
Offshore Wind Farm
Maritime Engineering
Maritime Code
Pilot-type Offshore
 
瀏覽
  • 機構典藏
  • 研究成果檢索
  • 研究人員
  • 單位
  • 計畫
DSpace-CRIS Software Copyright © 2002-  Duraspace   4science - Extension maintained and optimized by NTU Library Logo 4SCIENCE 回饋