Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • Home
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
  • Explore by
    • Research Outputs
    • Researchers
    • Organizations
    • Projects
  • Communities & Collections
  • SDGs
  • Sign in
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub
  2. 電機資訊學院
  3. 電機工程學系
Please use this identifier to cite or link to this item: http://scholars.ntou.edu.tw/handle/123456789/21453
DC FieldValueLanguage
dc.contributor.authorSheng-Huei Leeen_US
dc.contributor.authorWei-Chang Songen_US
dc.contributor.authorJian-Hong Liuen_US
dc.contributor.authorYoung-Huei Hongen_US
dc.contributor.authorChia-Chi Chuen_US
dc.date.accessioned2022-04-20T01:52:22Z-
dc.date.available2022-04-20T01:52:22Z-
dc.date.issued2020-10-
dc.identifier.isbn978-1-7281-7193-7-
dc.identifier.issn0197-2618-
dc.identifier.urihttp://scholars.ntou.edu.tw/handle/123456789/21453-
dc.description.abstractDue to recent energy transformations in Taiwan, Taiwan power company planned to install several new generation units in DT power plant. However, due to the difficulty to construct new EHV transmission lines in its neighboring area, the system will experience transient instability problem under severe N-2 conditions. In order to tackle out this challenging task, two techniques, including system integration protection scheme (SIPS) and automatic reclosing (AR) of transmission lines are considered. For three-phase faults, the generator rejection scheme (GRS) in SIPS is recommended for quickly maintaining the power balance. The reliability-based GRS is studied in this paper. Redundant voting mechanisms are considered to reduce the risk of inappropriate generation rejections. Settings of the arming threshold of the GRS are investigated under the calculation of the risk. For other temporary non-severe N-2 faults, multi-phase automatic reclosing (MRAP) is recommended to restore the system in the timing manner. Impacts of unbalanced fault current with respect to the withstanding capability of the generator are also outlined. Simulation studies are conducted to validate the proposed solution.en_US
dc.language.isoen_USen_US
dc.publisherIEEEen_US
dc.titleApplications of System Integrity Protection Scheme and Multi-Phase Reclosing of Transmission Lines for Stability Enhancements of Taiwan Power Systemen_US
dc.typeconference paperen_US
dc.relation.conference2020 IEEE Industry Applications Society Annual Meeting,Detroit, MI, USAen_US
dc.identifier.doi10.1109/IAS44978.2020.9334724-
item.openairecristypehttp://purl.org/coar/resource_type/c_5794-
item.cerifentitytypePublications-
item.languageiso639-1en_US-
item.fulltextno fulltext-
item.grantfulltextnone-
item.openairetypeconference paper-
crisitem.author.deptNational Taiwan Ocean University,NTOU-
crisitem.author.deptDepartment of Electrical Engineering-
crisitem.author.deptCollege of Electrical Engineering and Computer Science-
crisitem.author.parentorgCollege of Electrical Engineering and Computer Science-
crisitem.author.parentorgNational Taiwan Ocean University,NTOU-
Appears in Collections:電機工程學系
Show simple item record

Page view(s)

124
Last Week
0
Last month
1
checked on Jun 30, 2025

Google ScholarTM

Check

Altmetric

Altmetric

Related Items in TAIR


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Explore by
  • Communities & Collections
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Build with DSpace-CRIS - Extension maintained and optimized by Logo 4SCIENCE Feedback