Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • 首頁
  • 研究成果檢索
  • 研究人員
  • 單位
  • 計畫
  • 分類瀏覽
    • 研究成果檢索
    • 研究人員
    • 單位
    • 計畫
  • 機構典藏
  • SDGs
  • 登入
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub
  2. 工學院
  3. 海洋工程科技學士學位學程(系)
請用此 Handle URI 來引用此文件: http://scholars.ntou.edu.tw/handle/123456789/26666
DC 欄位值語言
dc.contributor.authorTseng, I. -Fanen_US
dc.contributor.authorHsu, Chih-Hungen_US
dc.date.accessioned2026-08-10T03:11:43Z-
dc.date.available2026-08-10T03:11:43Z-
dc.date.issued2026/4/28-
dc.identifier.issn2352-4847-
dc.identifier.urihttp://scholars.ntou.edu.tw/handle/123456789/26666-
dc.description.abstractGlobal commitments to carbon neutrality have heightened the focus on greenhouse gas emissions from infrastructure projects. Land reclamation, extensively used to expand port capacity in coastal regions, requires large-scale earthworks, substantial material use, and intensive heavy equipment operation, all of which generate considerable carbon emissions. However, design-phase estimates of these emissions typically differ from construction-phase emissions because of uncertainties in field conditions and variations in material reuse efficiency. This study applies a partial life cycle assessment with a cradle-to-construction boundary to quantify and compare design- and construction-phase emissions for a land reclamation project at the Port of Taipei, Taiwan. Using bills of quantities, construction records, and emission factors from Taiwan's Ministry of Environment database, the design- and construction-phase emissions were calculated as 12,874,621 and 13,521,035 kg CO2e, respectively, indicating an underestimation of 4.78% at the design stage. The primary causes of this discrepancy were differences in dredging quantities, marine equipment operating time, and higher-than-assumed recovery rates of reusable materials. The recycling of existing concrete blocks and revetment rocks led to substantial carbon savings; each reused concrete block embodied approximately 684 kg CO2e, compared with approximately 7250 kg CO2e for a newly manufactured block. The results demonstrate that quantity variation and on-site uncertainties are the dominant drivers of the emission discrepancies, whereas design-phase unit-rate estimates remain sufficiently accurate for preliminary carbon assessments. This case study provides project-level evidence for refining carbon accounting practices in maritime infrastructure and supports the integration of material reuse and waste minimization strategies into early-stage port planning.en_US
dc.language.isoEnglishen_US
dc.publisherELSEVIERen_US
dc.relation.ispartofENERGY REPORTSen_US
dc.subjectCarbon footprinten_US
dc.subjectLand reclamationen_US
dc.subjectLife cycle assessmenten_US
dc.subjectMaterial reuseen_US
dc.subjectPort infrastructureen_US
dc.subjectEmission discrepancyen_US
dc.subjectWaste minimization strategiesen_US
dc.titleCarbon footprint discrepancy between design and construction phases in maritime engineering projects: A case study of land reclamation at the port of Taipeien_US
dc.typejournal articleen_US
dc.identifier.doi10.1016/j.egyr.2026.109328-
dc.identifier.isiWOS:001759415100001-
dc.relation.journalvolume15en_US
item.fulltextno fulltext-
item.languageiso639-1English-
item.openairecristypehttp://purl.org/coar/resource_type/c_6501-
item.grantfulltextnone-
item.openairetypejournal article-
item.cerifentitytypePublications-
crisitem.author.deptNational Taiwan Ocean University,NTOU-
crisitem.author.deptCollege of Engineering-
crisitem.author.deptBachelor Degree Program in Ocean Engineering and Technology-
crisitem.author.parentorgNational Taiwan Ocean University,NTOU-
crisitem.author.parentorgCollege of Engineering-
顯示於:海洋工程科技學士學位學程(系)
顯示文件簡單紀錄

Google ScholarTM

檢查

Altmetric

Altmetric

TAIR相關文章


在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

瀏覽
  • 機構典藏
  • 研究成果檢索
  • 研究人員
  • 單位
  • 計畫
DSpace-CRIS Software Copyright © 2002-  Duraspace   4science - Extension maintained and optimized by NTU Library Logo 4SCIENCE 回饋