標題: | Selecting an adequate procedure for the electrochemical chloride removal | 作者: | Yeih, WC Chang, JJ Hung, CC |
關鍵字: | eletrochemical chloride removal;chloride ions;pH (A);open circuit potential;resistivity;STEEL-REINFORCED MORTAR;BOND DEGRADATION;EXTRACTION TREATMENT;CONCRETE STRUCTURES;REBAR | 公開日期: | 五月-2006 | 卷: | 36 | 期: | 3 | 來源出版物: | Cement and Concrete Research | 摘要: | This paper concerns the proper selection of the electrochemical chloride removal (ECR) current and the ECR duration. Four constant ECR current densities, 100, 200, 400 and 800 mu A/cm(2), were applied to concretes for 1 to 6 weeks. The remaining chloride contents nearby the reinforcement were measured to understand how fast the ECR process can remove chloride ions out of concrete. The open circuit potential and corrosion rate measurements were performed to examine the corrosion status after ECR. In addition, the pH value nearby the reinforcement and the apparent electrical resistivity of concretes after ECR were measured. The results showed that the remaining chloride ions decreased, the open circuit potential became nobler, the corrosion rate decreased, the pH value increased and the apparent electrical resistivity increased as the ECR parameter, defined as the product of the ECR current density and the ECR duration, increased, The ECR parameter can provide a direction in designing the ECR process. (c) 2006 Elsevier Ltd. All rights reserved. |
URI: | http://scholars.ntou.edu.tw/handle/123456789/1450 | ISSN: | 0008-8846 | DOI: | 10.1016/j.cemconres.2005.12.008 |
顯示於: | 河海工程學系 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。