Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • Home
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
  • Explore by
    • Research Outputs
    • Researchers
    • Organizations
    • Projects
  • Communities & Collections
  • SDGs
  • Sign in
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub
  2. 海洋科學與資源學院
  3. 海洋環境資訊系
Please use this identifier to cite or link to this item: http://scholars.ntou.edu.tw/handle/123456789/10919
Title: Conceptual weather environmental forecasting system for identifying potential failure of under-construction structures during typhoons
Authors: Wei, Chih-Chiang 
Keywords: DECISION TREES;NEURAL-NETWORKS;TIME-SERIES;WIND-SPEED;MODEL;PREDICTION;SIMULATION;REGRESSION;REGIONS;COASTAL
Issue Date: Sep-2017
Publisher: ELSEVIER SCIENCE BV
Journal Volume: 168
Start page/Pages: 48-59
Source: J WIND ENG IND AEROD
Abstract: 
In this study, we developed a conceptual weather environmental forecasting system (CWEFS) for predicting the failure of under-construction structures during typhoons. Major functions of the developed system include 1) forecasting hourly typhoon wind velocity, 2) analyzing structure reference load during the construction stage, 3) identifying potential failure of under-construction structures, and 4) evaluating the weather in future hours to determine whether the conditions are suitable for work. Data-driven models, namely support vector machines for regression (SVRs), regression, and two decision trees (namely C5.0 and CART) were employed in this study as forecasting techniques to predict the wind velocity on Orchid Island, Taiwan, the study site. Structure reference load analysis was performed using a finite element model to evaluate the reference load on an experimental tank under construction. Typhoons Nanmadol (2011) and Saola (2012) were selected for real-time simulation by using the proposed CWEFS. This study identified potential collapses by using 1- to 6-h-ahead wind speed predictions. However, prediction errors inevitably occur. The results showed that the SVRs provided excellent prediction accuracy compared with regression, C5.0, and CART regarding the average time error between the observed and predicted values in all structure scenarios. A high forecast time error might result in increased construction costs and delays in construction schedules. Thus, we suggest that shorter prediction windows (e.g., 1 and 2 h) and models with higher prediction accuracy (e.g., SVR and C5.0) be employed to create a reasonable warning system.
URI: http://scholars.ntou.edu.tw/handle/123456789/10919
ISSN: 0167-6105
DOI: 10.1016/j.jweia.2017.05.010
Appears in Collections:13 CLIMATE ACTION
海洋環境資訊系

Show full item record

WEB OF SCIENCETM
Citations

15
Last Week
0
Last month
0
checked on Jun 27, 2023

Page view(s)

226
Last Week
1
Last month
0
checked on Jun 30, 2025

Google ScholarTM

Check

Altmetric

Altmetric

Related Items in TAIR


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Explore by
  • Communities & Collections
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Build with DSpace-CRIS - Extension maintained and optimized by Logo 4SCIENCE Feedback