Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • Home
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
  • Explore by
    • Research Outputs
    • Researchers
    • Organizations
    • Projects
  • Communities & Collections
  • SDGs
  • Sign in
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub
  2. 工學院
  3. 系統工程暨造船學系
Please use this identifier to cite or link to this item: http://scholars.ntou.edu.tw/handle/123456789/25372
Title: Assessment of fatigue crack growth in metro cast manganese steel frogs and inspection strategy
Authors: Wu, Tung-Yu
Ieong, Ho Ieng
Hsu, Wei-Lun 
Chang, Chia-Ming
Lai, Yung-Cheng
Keywords: Rail;Cast high manganese steel frog;Crack growth;FEM;LEFM;Inspection strategy
Issue Date: 2024
Publisher: PERGAMON-ELSEVIER SCIENCE LTD
Journal Volume: 163
Source: ENGINEERING FAILURE ANALYSIS
Abstract: 
Fatigue cracking is one of the notable failure mechanisms of railway turnout frogs due to high contact forces induced by the wheel-rail impact. However, the treatments specific to the frogs of cast high manganese steel to prevent sudden failure are rarely provided and are independent of the crack conditions, which can significantly affect the fatigue crack growth rate. To address this shortcoming, the fatigue crack growth in a cast high manganese steel frog is computationally investigated with varied wheel and crack conditions. The dynamic wheel-frog impact is first simulated to obtain the distribution of contact pressure imposed on the frog, and the propagation of the fatigue crack is then predicted using the finite element formulation in fracture mechanics. The simulation results show that the train speed and axle load can change the maximum contact stress. Nevertheless, when representing the growth rate in terms of the cumulative passing axle load, the effect of axle load and train speed on the crack growth is minimal and moderate, respectively. In contrast, the initial crack conditions, including the location and angle, have an overweighted influence. As a result, an inspection scheduling strategy for identified cracks with different conditions is proposed to consider both safety and operational efficiency.
URI: http://scholars.ntou.edu.tw/handle/123456789/25372
ISSN: 1350-6307
DOI: 10.1016/j.engfailanal.2024.108512
Appears in Collections:系統工程暨造船學系

Show full item record

Page view(s)

130
checked on Jun 30, 2025

Google ScholarTM

Check

Altmetric

Altmetric

Related Items in TAIR


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Explore by
  • Communities & Collections
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Build with DSpace-CRIS - Extension maintained and optimized by Logo 4SCIENCE Feedback