Skip navigation
  • 中文
  • English

DSpace CRIS

  • DSpace logo
  • Home
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
  • Explore by
    • Research Outputs
    • Researchers
    • Organizations
    • Projects
  • Communities & Collections
  • SDGs
  • Sign in
  • 中文
  • English
  1. National Taiwan Ocean University Research Hub
  2. 海運暨管理學院
  3. 輪機工程學系
Please use this identifier to cite or link to this item: http://scholars.ntou.edu.tw/handle/123456789/25428
Title: Formation Control of Heterogeneous Multi-Agent Systems Under Fixed and Switching Hierarchies
Authors: Aslam, Muhammad Shamrooz
Bilal, Hazrat
Chang, Wen-Jer 
Yahya, Abid
Badruddin, Irfan Anjum
Kamangar, Sarfaraz
Hussien, Mohamed
Keywords: Heterogeneous multi-agent systems;Lyapunov functionals;formation control;resource constraints;Heterogeneous multi-agent systems;Lyapunov functionals;formation control;resource constraints
Issue Date: 2024
Publisher: IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
Journal Volume: 12
Start page/Pages: 97868-97882
Source: IEEE ACCESS
Abstract: 
Modern information technology is driving the rapid development of the information and automation industry through the combination of computer technology, communication technology, and control technology. Inspired by nature's cluster movement, such as birds, people proposed the concept of Multi-Agent Systems (MASs). This paper deals with the formation control problem for a class of heterogeneous multi-agent systems with time-delays. First, the formation control of heterogeneous multi-agent systems with communication delay in fixed and switching topologies is investigated. A heterogeneous multi-agent system model with input delay and communication delay is established. Furthermore, based on this model, the formation control protocol is designed and the stability of the proposed control protocol in fixed and switched topologies is analyzed. The first- and second-order multi-agent control system was formulated for both fixed and switched topology, respectively. Then, using the new LMI toolbox, the feasibility of the parameters is obtained and the example is created by MATLAB. The simulation results show that the proposed formation control protocol with delay in this paper can make the systems converge to the expected value under fixed and switched hierarchies.
URI: http://scholars.ntou.edu.tw/handle/123456789/25428
ISSN: 2169-3536
DOI: 10.1109/ACCESS.2024.3419815
Appears in Collections:輪機工程學系

Show full item record

Page view(s)

71
checked on Jun 30, 2025

Google ScholarTM

Check

Altmetric

Altmetric

Related Items in TAIR


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Explore by
  • Communities & Collections
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Build with DSpace-CRIS - Extension maintained and optimized by Logo 4SCIENCE Feedback