http://scholars.ntou.edu.tw/handle/123456789/26666| 標題: | Carbon footprint discrepancy between design and construction phases in maritime engineering projects: A case study of land reclamation at the port of Taipei | 作者: | Tseng, I. -Fan Hsu, Chih-Hung |
關鍵字: | Carbon footprint;Land reclamation;Life cycle assessment;Material reuse;Port infrastructure;Emission discrepancy;Waste minimization strategies | 公開日期: | 2026 | 出版社: | ELSEVIER | 卷: | 15 | 來源出版物: | ENERGY REPORTS | 摘要: | Global commitments to carbon neutrality have heightened the focus on greenhouse gas emissions from infrastructure projects. Land reclamation, extensively used to expand port capacity in coastal regions, requires large-scale earthworks, substantial material use, and intensive heavy equipment operation, all of which generate considerable carbon emissions. However, design-phase estimates of these emissions typically differ from construction-phase emissions because of uncertainties in field conditions and variations in material reuse efficiency. This study applies a partial life cycle assessment with a cradle-to-construction boundary to quantify and compare design- and construction-phase emissions for a land reclamation project at the Port of Taipei, Taiwan. Using bills of quantities, construction records, and emission factors from Taiwan's Ministry of Environment database, the design- and construction-phase emissions were calculated as 12,874,621 and 13,521,035 kg CO2e, respectively, indicating an underestimation of 4.78% at the design stage. The primary causes of this discrepancy were differences in dredging quantities, marine equipment operating time, and higher-than-assumed recovery rates of reusable materials. The recycling of existing concrete blocks and revetment rocks led to substantial carbon savings; each reused concrete block embodied approximately 684 kg CO2e, compared with approximately 7250 kg CO2e for a newly manufactured block. The results demonstrate that quantity variation and on-site uncertainties are the dominant drivers of the emission discrepancies, whereas design-phase unit-rate estimates remain sufficiently accurate for preliminary carbon assessments. This case study provides project-level evidence for refining carbon accounting practices in maritime infrastructure and supports the integration of material reuse and waste minimization strategies into early-stage port planning. |
URI: | http://scholars.ntou.edu.tw/handle/123456789/26666 | ISSN: | 2352-4847 | DOI: | 10.1016/j.egyr.2026.109328 |
| 顯示於: | 海洋工程科技學士學位學程(系) |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。